INSTALLATION

SCREEN PAINT FOR FLOOR INSTALLATION

0. Step

Working conditions: ambient temperature 5° – 35°C, relative humidity 85% or less
Applicator: spray equipment
Application: over 2 times
Undersurface: surface cleanup required

1. Step

Choose a suitable location for the future floor screen. Select appropriate surface, where projection screen paint for floor should be applied. Examine the condition of the selected surface to be used for projection before painting begins.

2. Step

The surface selected to be a projection screen must be fit up before painting. Usually some sandpaper work and bottom surface cleaning is necessary to get perfectly smooth surface without spots and cracks. Alternatively, galvanized iron sheets sticked to the floor can be used to have the possibility to easily return back the floor to the initial condition.

3. Step

Select the area and the shape on the floor, which you want to transform to projection screen. Use masking tape to cover adjacent areas that you do not wish to paint.

4. Step

In the case of highly absorbent or multi-colored floors, it is strongly recommended to use a primer as a base under the projection screen paint. This undercoating step is optional.

5. Step

Shake both bottles of projection screen paint for floor (base and hardener) sharply in the bottles before opening. After opening, mix base and hardener together and pour mixed projection screen paint for floor to the spray equipment.

6. Step

Start spraying on floor surface. Make the movements steady and uniform to reach the smoothest surface. In case of no availability of spray equipment contact us for price proposal of spray installation.

7. Step

Remove the masking tape immediately after painting the projection screen paint before drying (removing the masking tape after the projection paint has dried may cause the paint to “tear” from the surface).

8. Step

Let the projection screen paint for floor to dry for about 3 hours (touch dry), resp. 24 hours (hard dry). The exact time depends on weather conditions, especially temperature and humidity.

9. Step

Install the projector and set the projector to beam to the floor painted with a projection screen paint for floor.

10. Step

Start a slideshow, video, or live stream.